28 | Installation
Fig. 38 Lagging for the various boiler sizes (dimensions in mm)
4.15.2 Fitting the connection plates
B Place top front cross bars onto the cast lugs and
screw in place with hexagon bolts (M8 x 12). The
folded edge on the front bar must face forwards.
B Place top rear cross bars onto the cast lugs and screw
in place with hexagon bolts (M8 x 12). The folded
edge of the rear cross bar must point towards the
back.
6 720 803 940 (2010/03)
UNI 7000 F