Download Print this page

Ranger design S3-RA60-3 Installation Manual page 8

Shelving aluminum, ram c/v, box truck / trailer

Advertisement

PHASE 2 – INSTALLATION
2.2 MARK HOLES FOR PLUS NUTS
2.2.1 After attaching the brackets mark the holes on the brackets and end panels to the structure of the
truck or van.
For technical support, contact us at 1-800-565-5321
Structure of the truck or van.
Mark 2 holes of the brackets head
on the vehicle horizontal rim.
TOOLS
q Marker
MARK
Mark 2 holes of each end panel on the
vehicle floor.
TOOLS
q Marker
MARK
S3-RA60-3 Installation Guide | REV. C1 | Page 8

Advertisement

loading