AHP60 26/32 kW - Installation, Use and Maintenance
is any copper or aluminium, appropriate treatment is recommended to guarantee a long lifetime for
the unit. In most cases, this treatment involves adding chemical solution corrosion inhibitors to the
installation. We recommend contacting water treatment specialists.
•
Unit monitoring
If the recommendations listed above (new installation or renovation) have been followed, the unit
monitoring is limited to:
- Checking the amount of make-up water (fill water volume + make-up water volume < 3 times the
unit volume).
- Checking the pH level (stable or slightly increasing)
- Checking the water hardness (TH stable or slightly decreasing)
We recommend monitoring these parameters two to three times a year. It should be noted that the
"make up water quantity" parameter is vital for a long lifetime for the unit.
If any of these three above parameters deviates from the above recommendations, refer to a water
treatment specialist to correct the problem.
•
Setting up a plate exchanger
If the recommendations listed above cannot be met, you can set up a plate exchanger to separate
the primary system from the secondary system, which protects the heat pump from undesirable
effects.
•
Setting up a filtration system
A filtration system on the back of the heat pump is obligatory in order to remove suspended particles
from the unit.
3.5.6.
Unit internal hydraulic scheme
PLATE HEAT
EV
1
EXCHANGER
DV
1
DRAIN VALVE
RV
1
SAFETY VALVE
USAGE INLET WA-
IE1
1
TER TEMPERATURE
SENSOR
USAGE OUTLET WA-
OE1
1
TER TEMPERATURE
SENSOR
KA1
1
Anti-freeze tracer
CAUTION:
36 / 74
LEGEND
W-IN
WATER INLET
W-OUT
WATER OUTLET
P1
1
ELECTRONIC CIRCULATOR
AUTOMATIC AIR VENT
AV
1
FC1
1
FLOW SWITCH
We recommend connecting the safety valve vent to an appropriate conveyor
/ discharge.
If not, the discharge water may build up around the machine and constitute a
slipping or falling risk.
VALVE
Figure 11 - Hydraulic circuit 26 - 32-kW
OE1
IE1
00U07352250-A_ EN