Rack Mounting the Server
1.
Pull the middle rail fully extended in lock position, ensure ball bearing
retainer is located at the front of the middle rail.
2.
Horizontally insert the chassis into middle-outer rails. When hit a stop,
please pull/push the blue release tab on the inner rails.
3.
Tighten chassis with shipping screws.
59
http://www.tyan.com