Download Print this page

Chapter 4. Installation - Saadat Dena 350 Service Manual

Electrocardiograph
Hide thumbs Also See for Dena 350:

Advertisement

Chapter 4. Installation

Chapter 4. Installation
4.1 System installation
1. Make sure the package is not damaged.
2. Take out the accessories package and make sure that the accessories are complete.
3. Install the proper trolley as it will be discussed on section 4.2.
4. Place the cable holder and plug AC-cable to system. Check the safety grounding
system.
5. Plug the system to AC-line and turn it on.
6. Unplug system. It must continue working (internal battery operation).
-Make sure that the battery indicator lights on. If it does not light, check your local power
supply and power cable connection. If the problem still exists, contact the local After Sale
Service.
- It is necessary to charge the battery completely before using, charge the battery for at
least 8 hours.
7. Test the system according to test III procedure and fill out test forms.
8. Fill out the warranty card.
4.2 Trolley installation
Open the trolley package and tight the separated parts together.
Use only trolley approved by POOYANDEGAN RAH SAADAT
Co.
Turn off system and unplug it before any installing operation.
15
Service Manual – Dena 350

Advertisement

loading