Download Print this page
Classic Exhibits eco systems ECO-4100 Setup Instructions

Classic Exhibits eco systems ECO-4100 Setup Instructions

20' x 20' display

Advertisement

Quick Links

© 2022
REV 10/2022
Order #XXXXX
ECO-4100 - 20' x 20' Display
20'
Plan View
20'
SETUP INSTRUCTIONS
If you would like to tell us about your experience with your setup instructions please email us at info@classicexhibits.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the eco systems ECO-4100 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Classic Exhibits eco systems ECO-4100

  • Page 1 © 2022 REV 10/2022 Order #XXXXX ECO-4100 - 20’ x 20’ Display 20’ Plan View 20’ SETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please email us at info@classicexhibits.com...
  • Page 2: Plan View

    © 2022 Order #XXXXX Plan View = 1 sq foot...
  • Page 3: General Setup Instructions

    © 2022 Order #XXXXX General Information General Setup Instructions - Read entire setup instruction manual prior to WARNING unpacking parts and pieces. - The setup instructions are created specifically for this configuration. - Setup instructions are laid out sequentially in steps, including exploded views with detailed explanation for assembly.
  • Page 4: Side-By-Side

    © 2022 Order #XXXXX Gravitee Assembly Assembly Assembly Cont’d Push pin lock into hole of connecting frame. Note: Block of pin lock will secure in groove. Side-by-Side Assembly Corner Connector 1) Frames: Place frames side-by-side with one higher than the other, then slide panel down to lock panels securely together.
  • Page 5 © 2022 Order #XXXXX CEI152 Frame Assembly Slide both connectors across seam of extrusions. Disassembly Tighten all knobs. Straight Connection 1) Loosen all knobs. Straight Connector When assembling frame, first attach all straight 2) Slide connectors off of one extrusion. connectors, then attach corner connectors.
  • Page 6 © 2022 Order #XXXXX SEG Installation Graphic Removal Corner A Corner B Corner D Corner C Step 1 Step 2 Step 3 It is important to first insert To remove the graphic from Insert corner A. Turn edge of Repeat Step 1 for opposite Once all corners are inserted, graphic into each alternate the frame, locate the fabric...
  • Page 7 © 2022 Order #XXXXX Aero Frame Assembly Using Your Setup Instructions When assembled The Aero Setup Instructions are created specifically for your configuration. The instructions include an exploded view of the frame which is sequentially labeled. We encourage you to review the instructions before attempting to assemble your exhibit.
  • Page 8 © 2022 Order #XXXXX Lower Gravitee Tower Assembly Item Qty. Description Steps: 38”w x 95”h lower Gravitee Panel Refer to the Gravitee Assembly general information page. 94.5”h lower Gravitee Corner Post w/ caps 38”w x 95”h lower Gravitee Panel 1) Assemble Gravitee posts & panels [1] through [10] together 38”w x 95”h lower Gravitee Panel in numerical order as shown.
  • Page 9 © 2022 Order #XXXXX Upper Gravitee Tower Assembly Item Qty. Description Steps: 38”w x 95”h upper Gravitee Panel w/ S44 Refer to the Gravitee Assembly general information page. 94.5”h upper Gravitee Corner Post w/ caps 38”w x 95”h upper Gravitee Panel 1) Assemble Gravitee posts &...
  • Page 10 © 2022 Order #XXXXX Tower Graphics S E G G ra ph ic SEG Graphic Installation Steps: S E G 1) Apply SEG graphics to tower assembly p h i c G r a as shown. Corner A Corner B S E G p h i c G r a...
  • Page 11 © 2022 Order #XXXXX Tower Canopy Item Qty. Description Steps: 86”w x 18”d x 3”h Canopy Panel 1) Attach Ceiling Panels [A,B] to top of Gravitee tower, using 86”w x 18”d x 3”h Canopy Panel Bolts & V4 connectors. See Ceiling Attachment detail.
  • Page 12 © 2022 Order #XXXXX Tower Attachments Item Qty. Description 8” x 12” Monitor Mounting Plate Large Monitor Mount Steps: 1) Attach Monitor Mounts to tower panels [3/4] & [8/9], using mounting plates & bolts. Monitor Mount Attachment detail. Completed Tower Assembly Monitor Mount Attachment screw 1.
  • Page 13 © 2022 Order #XXXXX Kiosk Frame Assembly Item Qty. Description 95”h CEI152 Vertical Extrusion 26.823”h CEI152 Vertical Extrusion 95”h CEI152 Vertical Extrusion 26.823”h CEI152 Vertical Extrusion 48”w CEI152 Horizontal Extrusion 48”w CEI152 Horizontal Extrusion 44.353”w Z45 Horizontal Extrusion 72”h Z45 Vertical Extrusion 72”h Z45 Vertical Extrusion When assembled Assemble frames flat on ground.
  • Page 14 © 2022 Order #XXXXX Kiosk Attachments Item Qty. Description 42”w x 16”d x 42”h Kiosk Counter r a p h i c Steps: r a p h i c Refer to the SEG Installation general information page. 1) Apply SEG graphic to front of assembled frame. 2) Connect counter to verticals [9,10] of frame assembly, using Standoff Barrels.
  • Page 15 © 2022 Order #XXXXX Aero Frame Attachment Item Qty. Description Aero Clamps Steps: 1) Attach Aero Clamps to top of kiosk horizontals [7]. Aero Clamp Attachment detail. 2) Attach Aero frame to Aero clamps, and attach to vertical extrusions in tower panels [1] & [6] using Aero Clamps.
  • Page 16 © 2022 Order #XXXXX ECO-42C Reception Counter Item Qty. Description Steps: 9/10 46”w CEI110 Horizontal Extrusion 1) Connect horizontals [11,12] between verticals [9,10], 11/12 30.5”h CEI110 Vertical Extrusion sliding backer panel between verticals. CEI-110 Corner Connection detail. 2) Attach left & right cabinets to frame assembly [9/10/11/12] CEI-110 Corner Connection using bolts &...