Installing The Chute; Installing The Traction-Control Linkage - Toro Power Max 826 OXE Operator's Manual

Hide thumbs Also See for Power Max 826 OXE:
Table of Contents

Advertisement

2

Installing the Chute

Parts needed for this procedure:
2
Nut
2
Carriage bolt
2
Flat washer
Procedure
1. Place the chute on the frame and align the
discharge-chute mount to the chute support.
1
1. Carriage bolt
2. Flat washer
2. Secure the discharge-chute mount using 2 bolts,
2 nuts, and 2 flat washers.
3
2
g019379
Figure 5
3. Nut
3
Installing the
Traction-Control Linkage
Parts needed for this procedure:
2
Hairpin cotter
3
Flat washer
Procedure
1. Insert the lower end of the rod into the lower-link
arm so that the bent end of the speed-control
rod faces rearward
g019004
g019379
2. Secure the lower end of the speed-control rod
with a flat washer and a hairpin cotter
3. Place a flat washer on the trunnion
1. Speed-selector lever
2. Trunnion
7
(Figure
6).
Figure 6
(Figure
(Figure
Figure 7
3. Inner washer
4. Outer washer
g019004
6).
7).
g006528

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

38815

Table of Contents