Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
7
8
1
Installing the Upper Handle
Parts needed for this procedure:
2
Handle bolt
2
Curved washer
2
Locknut
Procedure
Note:
Do not remove the rubber band on the cables
until you have installed the upper handle.
1. Lift and rotate the upper handle and position it
over the lower handle
2. Install the 2 handle bolts, 2 curved washers, and
2 locknuts in the lower-handle holes
Description
Handle bolt
Curved washer
Locknut
Nut
Carriage bolt
Flat washer
Hairpin cotter
Flat washer
Carriage bolt
Locknut
No parts required
No parts required
No parts required
(Figure
4).
(Figure
Qty.
2
2
2
2
2
2
2
3
2
2
–
–
–
4).
6
Use
Install the upper handle.
Install the chute.
Install the traction-control linkage.
Install the chute-control rod.
Check the engine-oil level.
Check the skids and scraper.
Check the operation of the traction drive.
g019003
Figure 4
g019003