Installing The Chute-Control Rod - Toro Power Max Heavy Duty 1028 OXE Operator's Manual

Hide thumbs Also See for Power Max Heavy Duty 1028 OXE:
Table of Contents

Advertisement

Figure 12
1. Speed-selector lever
2. Trunnion
Note:
For easier installation, leave the flat
washer on the trunnion
4. Shift the speed-selector lever into R2 position.
5. Rotate the lower link arm fully upward
(counterclockwise)
Figure 13
6. Lift up on the speed-control rod and insert the
trunnion into the hole in the speed-selector lever
(Figure
12).
Note:
If the trunnion does not fit into the hole
when you lift up on the speed-control rod,
rotate the trunnion upward or downward on the
speed-control rod until it fits.
7. Secure the trunnion and upper end of the
speed-control rod with the outer washer and
hairpin cotter that you previously removed.
3. Inner washer
4. Outer washer
(Figure
12).
(Figure
13).
Note:
For easier installation, look down through
the opening in the speed selector
g006528
1. Speed selector
4
Installing the Chute-Control
Rod
Parts needed for this procedure:
2
Carriage bolt
2
Locknut
Procedure
g000987
1. Unwrap the Quick Stick® and rotate it so that it
is upright and in the center.
2. Hold the blue trigger cap down and pull the lever
fully rearward.
Note:
The discharge chute and deflector should
face forward. If they do not, hold the blue trigger
cap down (but do not move the Quick Stick) and
rotate the discharge chute until they do.
3. Align the flattened back end of the long
chute-control rod with the flattened front end of
the short rod that extends from the control panel
so that they nest together
8
(Figure
Figure 14
(Figure
15).
14).
g006527

Advertisement

Table of Contents
loading

This manual is also suitable for:

38834

Table of Contents