Installing The Chute-Control Rod - Toro Power Max Heavy Duty 826 OXE Operator's Manual

Hide thumbs Also See for Power Max Heavy Duty 826 OXE:
Table of Contents

Advertisement

Note: For easier installation, look down through the
opening in the speed selector
1. Speed selector
4
Installing the Chute-Control
Rod
Parts needed for this procedure:
2
Carriage bolt
2
Locknut
Procedure
1. Unwrap the Quick Stick and rotate it so that it is
upright and in the center.
2. Hold the blue trigger cap down and pull the lever fully
rearward.
Note: The discharge chute and deflector should face
forward. If they do not, hold the blue trigger cap
down (but do not move the Quick Stick) and rotate the
discharge chute until they do.
3. Align the flattened back end of the long chute-control
rod with the flattened front end of the short rod
that extends from the control panel so that they nest
together
(Figure
15).
(Figure
14).
Figure 14
1. Short rod
4. Insert the front end of the rod into the opening in
the back of the chute-gear cover until it slides into the
chute gear
(Figure
5. Align the holes in the nested ends of the rods and
insert 2 carriage bolts (in the loose-parts bag) through
the short rod from the left side of the machine (from
the operating position).
6. Insert the cable clip that supports the deflector cable
onto the forward carriage bolt, and secure the carriage
bolts with locknuts from the loose-parts bag
17).
g018657
1. Cable clip
8
g018656
Figure 15
2. Long chute-control rod
16).
Figure 16
Figure 17
2. Deflector cable
(Figure

Advertisement

Table of Contents
loading

This manual is also suitable for:

38805

Table of Contents