Grizzly G0960 Owner's Manual page 23

Mini sawmill pro
Table of Contents

Advertisement

7.
Repeat Steps 5–6 with left front and rear
rails.
8.
On top of rail brackets, install log bunk with
(8) M10-1.5 x 30 hex bolts,
and M10-1.5 flange nuts (see Figure 19).
Log Bunk
Figure 19. Log bunk installed over rail brackets
and rail junctions.
9.
Install last log bunk on rear rails with (8) M10-
1.5 x 30 hex bolts,
1.5 flange nuts (see Figure 20).
10. Use 90° square to adjust rear log bunk
square to rear rails, then tighten fasteners
from Step 9 (see Figure 20).
Log Bunk
Figure 20. Rear log bunk installed on rails.
11. Use 90° square to adjust front log bunk
square to front rails, then tighten fasteners
securing it to rails.
Model G0960 (Mfd. Since 09/22)
" flat washers,
3
8
x 8
" flat washers, and M10-
3
8
x 8
12. Loosen upper hex nuts on all adjustable feet,
level rails by adjusting lower hex nuts, then
tighten upper hex nuts to secure.
13. Tighten all track fasteners.
14. Install (2) log clamp shaft brackets at loca-
tions shown in Figure 21 with (4) M10-1.5 x
30 hex bolts,
" flat washers, and M10-1.5
3
8
flange nuts.
Log Clamp
Shaft Bracket
(1 of 2)
Figure 21. Log clamp shaft brackets installed.
15. Slide log clamp receivers onto log clamp
shafts, as shown in Figure 22.
16. Insert ends of log clamp shafts into log clamp
shaft brackets, then attach shafts to rails with
(4) M10-1.5 x 30 hex bolts,
and M10-1.5 flange nuts (see Figure 22).
Log Clamp
Receiver
(1 of 2)
x 4
Figure 22. Log clamp shafts installed on rails.
x 4
" flat washers,
3
8
Log Clamp
Shaft
(1 of 2)
-21-

Advertisement

Table of Contents
loading

Table of Contents