This chapter provides information on:
•
Preparing the site
•
Package contents
•
Required tools
•
Installing the hub
•
Connecting the hub
•
Completing and verifying the installation
Preparing the Site
Before you begin installing the Model EN516 hub, prepare the installation site. Make sure the
operating environment meets the physical requirements of the hub. The ambient temperature must
be between 0 C and 40 C. The maximum relative humidity must not exceed 90%.
You can install the hub on a flat surface, such as a tabletop or shelf, or within a standard 19-inch
rack. You should ensure that the front and rear panel of all units to be connected are easily
accessible for connecting cables and power and for monitoring the LED indicators.
Package Contents
The package should contain the following items:
•
Model EN516 hub
•
This manual
Installation
Chapter 3
Installation
3-1