4
Verifying the Installation
1. Check that there is no foreign matter in
the cabinet.
(1) Top of the cabinet
(2) Wiring terminal blocks
(3) Switches
(4) Bottom of the cabinet
(5) Rear of the modules
2. After verifying the installation, reinstall all
the covers.
3. (Remove the paper protective film from
the sealing putty.) After routing cables
and verifying cable connections, seal the
gap between cables and the cabinet using
sealing putty.
Paper
protective film
Sealing putty must be used as a whole and the
gap can be sealed only from the top.
5
Powering On and Starting the UPS
1. Before powering on the UPS, ensure that the UPS has passed all check items in the
Commissioning and Acceptance Report
2. Measure the voltage and frequency of the UPS upstream input switch. The line voltage range
is 138–485 V AC, and the frequency range is 40–70 Hz.
4. Do not remove the dustproof cover before
power-on to prevent dust inside the UPS.
Dustproof cover
Sealing putty
and Chapter 4.
11
UPS5000