Power Requirements - industro clean WAP NOVASTAR HPC 14/130E Operating And Instruction Manual

Cold water high pressure cleaner
Table of Contents

Advertisement

Ref. 4.3.
Power Requirements / Details of Electrical Connection
The connecting up of the high pressure cleaner must be carried out by a qualified
electrician and in accordance with the Factories, Machinery and Building Work Act, as
amended, and the Machinery and Occupational Safety Act.
It must be confirmed that the rated voltage of the equipment corresponds with the
mains power supply. With this particular machine, the connection should be by means
of a socket and plug arrangement, or alternatively using a suitable isolator.
It is imperative that the power supply to this machine be connected via an Earth
Leakage Circuit Breaker, which cuts off the power supply in the event of an electrical
short circuit.
The NovaStar HPC 14/130 E pressure cleaner requires a 220 Volt, single phase, 50 Hz
power supply with Earth wire protection.
The NovaStar HPC 14/150 E pressure cleaner requires a 380 Volt, 3 phase, 50 Hz
power supply with Earth wire protection.

Power requirements

Electrical connection
Electric current
Electric socket
PLEASE NOTE:
The NovaStar HPC 14/150 E is not equipped with an electric plug, due to the
variety of electric sockets in use, in Southern Africa.
380 Volt Version
:
4 kW electric motor
:
380V, 3 Phase, 50 Hz
: 7.8 Amps per phase
:
16 Amps (Cekon)
220 Volt Version
3 kW electric motor
220V, 1 Phase, 50 Hz
19 Amps
• when fitted with a 25055 nozzle
18 Amps (standard version)
• when fitted with a 2506 nozzle
14.7 Amps
• when fitted with a 25065 nozzle
3 pin socket (20A)
PAGE NO: 8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wap novastar hpc 14/150e

Table of Contents