Masalta MT24 Operation Manual

Edging power trowel

Advertisement

Quick Links

Advertisement

Table of Contents
loading

Summary of Contents for Masalta MT24

  • Page 2: Table Of Contents

    Table of Contents …………………………………………………………………….. 2 HEALTH & SAFETY Safety Precautions ……………………………………………………………………………… 2 …………………………………………………………………………….. 3 INTRODUCTION Operating Principle ………………………………………………………………………………3 Delivery Checks …………………………………………………………………………………. 3 Standard Features ……………………………………………………………………………… 3 Preparation for Service ……………………………………………………………………… 3-4 ……………………………………………………………………………… 4-6 OPERATIONS To Start …………………………………………………………………………………………… 4 To Shut Off ……………………………………………………………………………………….. 4 Initial Operation ………………………………………………………………………………..
  • Page 3: Health & Safety

    HEALTH & SAFETY SAFETY PRECAUTIONS Before using this equipment, study the entire owner’s manual to become familiar with its operation. Do not allow untrained or WARNING unauthorized personnel, especially children, to operate this equipment. Use only factory authorized parts for service. USE COMMON SENSE WHEN HANDLING FUELS l Transport and handle fuel only when contained in approved safety containers.
  • Page 4: Introduction

    INTRODUCTION OPERATING PRINCIPLE The following instructions were compiled to provide you information on how to obtain long and trouble free use of the unit. Periodic maintenance of this unit is essential. Read the manual in its entirety and follow the instructions carefully. Failure to do so may injure yourself or a bystander. DELIVERY CHECKS—Immediately on taking delivery of your new equipment and before putting it into service.
  • Page 5: Operations

    Unfolding Handle To unfold and secure the handle assembly: 1. New machine with folded handle. 2. Unfolding the adjustable handle and lock the screw. 3. Straighten the handle and lock the hinge pin. 4. Tighten the adjustable lever to lock the handle in its fully opened position. OIL LEVEL AND LUBRICATION—Check the oil level in the engine and gearbox.
  • Page 6: Lifting Trowel

    LIFTING THE TROWEL You can use the LIFTING HOOK to move the machine. MANEUVER OPERATION Below (Figure 1) illustrates a typical walk-behind trowel application. Practice maneuvering the trowel. The trick is to let the trowel do the work. Continue to practice maneuvering the trowel. Try to practice as if you were finishing a slab of concrete.
  • Page 7: Trowel Arm Adjustment Screw

    Do not turn the threaded insert when you put new blades onto the troweling machine. If you do, you will put the machine out of balance, these inserts are used to adjust the height of the outside of the troweling machine’s blades. This allows you to keep all blades level on the same plane. There are many reasons why adjustment may be necessary, such as, a slightly bent blade arm or wear between the blade arm and the base assembly or the threaded insert was turned when new blades were put onto the machine.
  • Page 8: Maintenance

    MAINTENANCE MAINTENANCE, LUBRICATION AND ADJUSTMENT To get long and trouble free service from your new Power Trowel, it is essential to perform periodic maintenance on engine and machine mechanisms. Follow the guidelines listed below; LUBRICATION A. ENGINE CRANKCASE Daily—check oil level in engine. Engine warranty is VOID if it is run without oil. Add oil as required to keep crankcase full.
  • Page 9: Technical Data

    4.2 kW MT30-4 Petrol, Honda GX160 4.0 kW WORKING SIZE (L x W x H) : Operation Mass (kg): MT24 series: 150 x 70 x 90 CM Operation Operation MT30 series: 158 x 76 x 90 CM Model Model Mass...
  • Page 10: Trowel Trouble Shooting

    TROUBLE SHOOTING (TROWEL) SYMPTOM POSSIBLE PROBLEM SOLUTION Make sure that the safety switch is ON or replace Safety switch malfunction? switch if necessary. Look at the fuel system. Make sure there is fuel being Engine running rough or not at Fuel? supplied to the engine.
  • Page 11: Warranty

    However, when in need of parts or major service, be sure to see your MASALTA dealer. For your convenience we have provided this space to record relevant data about your Edging Power Trowel.
  • Page 12: Ec Declaration

    CE-KONFORMITÄTSERKLÄUNG DECLARACIÓN DE CONFORMIDAD DE LA CE DÉCLARATION DE CONFORMITÉ C.E. MASALTA ENGINEERING CO., LTD Weisi Road, Baohe Industrial Estate, HeFei 230051, China hereby certifies that the construction equipment specified hereunder / bescheinigt, da. das Bauger.t / certifica que la máquina de construcción / atteste que le matériel : Category / Art / Categoría / Catégorie:...
  • Page 13 Distributed By MASALTA ENGINEERING CO., LTD Add: Weisi Road, Baohe Industrial Estate, Hefei 230051,China Tel: 86-551-4846601, 4846580 Fax: 86-551-4846616, 4846626 E-mail: sales@masalta.com.cn, masalta@mail.hf.ah.cn Http://www.masalta.com.cn Version: 01/09/02 Printed: 06/2009...

This manual is also suitable for:

Mt30Mt24-2Mt24-3Mt24-4Mt30-2Mt30-3 ... Show all

Table of Contents