Lauda Alpha A Operating Instructions Manual page 20

Hide thumbs Also See for Alpha A:
Table of Contents

Advertisement

Operation with external consumer
(circulation thermostat ( 6.4))
20
Hang the thermostat into the bath and fix the
clamp with the knurled screw on the edging
of the bath.
The wall thickness has to be 10 – 30 mm.
Check for tight fitting!
Cooling thermostats only
NEVER overturn the unit and never put it upside
down!
After transport and before starting up, store it
standing in upright position for two hours if possi-
ble.
Do not cover the ventilation openings.
Keep clear distance of at least 40 cm.
Pump connection link (silicone rubber)
Remove the silicone L-tube at the pump housing to improve
the circulation in the bath.
L-tube (silicone rubber)
Preparations
Carefully attach the immersion
thermostat to prevent it dropping into
the bath.
If this should occur during operation,
never reach into the bath! Withdraw
the mains plug immediately!
June 20, 2018/ YACE0092
Alpha

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents