8 | Connect power transformer
Locate the base power inlet lead (marked with 'POWER' at the inlet
of the control box). Connect this lead to the power transformer
(OP053) by coupling the plug/socket and secure by clipping the
cover latch. Then insert the mains power cable (OP054) into the
power transformer.
9 | Turn base onto
its feet
Using two people, turn the
smart base over and onto
its feet.
10 | Add mattress retention
bar/s to the base
Add the mattress retention bar by
inserting into the holes at the footend
of the smart base.
N.B. The MotionLuxe™ base has an additional retention
bar for the head end and the bars can be secured by
securing clips.
CAUTION:
The base is heavy. Ensure you
use two people to turn it over.