Amsco RELIANCE 444 Installation Instructions Manual page 3

Table of Contents

Advertisement

A WORD FROM STERIS CORPORATION
Follow each step of the uncrating/installation instructions in the
order presented. Open the cartons carefully to avoid damage to
the equipment inside. If you find any indication of damage to the
equipment (no matter how slight), show it to your supervisor.
A listing of the Safety Warnings and Cautions to be observed
when uncrating and installing this equipment can be found in
Section 1 of these instructions. Do not begin uncrating/installing this
equipment until you have become familiar with this information.
To properly install this unit, you will need the Equipment Drawing
(provided), showing all utility service and space requirements. If
drawing cannot be located, replacement copies may be obtained
by writing, faxing or telephoning STERIS giving the serial, equip-
ment and model numbers of your equipment.
STERIS supervision is recommended for installing and starting up
this equipment. Contact the STERIS Regional Office nearest you for
pricing and availability of this service in your region.
®
®
Amsco
Reliance
444 Load/Unload Modules, when connected to
Indications For Use
the Amsco Reliance 444 Single Chamber Washer/Disinfector, pro-
vide a fully automated rack conveyance system. Load/Unload
modules are available in one rack and two rack configurations.
Check the Occupational Health and Safety Act, as well as local
Advisory
electric and plumbing codes, for any special requirements that may
pertain to installation of this equipment.
©1999, STERIS Corporation. All rights reserved.
Printed in Canada
i
Table of Contents
Uncrating/Installation Instructions
122994-142

Advertisement

Table of Contents
loading

Table of Contents