INSTALLATION CHECKLIST

Installation Checklist
To assure complete and correct installation, Installation Checklist
must be completed after the conveyor modules are installed and
prior to performing Start-up Procedure.
NOTE: Contact your STERIS representative to schedule a techni-
cian to test your installation and demonstrate proper equipment
operation.
Disconnect switches (not by STERIS), capable of being locked
in OFF position only, installed in electrical supply lines near the
unit and in compliance with local codes, OSHA standards, etc.
Electrical supply for conveyor modules is as specified on Equip-
ment Drawing.
Building air line supplies air to Amsco
Single-Chamber Washer/Disinfector as specified on washer
equipment drawing (80 to 125 psig oil and moisture free).
Conveyor modules are level.
Drip pan drain hoses (D1 and D2) are properly connected.
Floor surrounding modules has non-slip surface.