INSTALLATION INSTRUCTIONS

Before Installing
WARNING - PERSONAL INJURY
AND/OR EQUIPMENT DAMAGE
HAZARD: Only fully qualified ser-
vice personnel should assemble
and/or make adjustments to this
equipment. Assembly or adjust-
ments done by inexperienced, un-
qualified personnel could cause
personal injury or result in costly
damage.

Cold Water Connections

Installation Instructions
1. Install the Amsco
Equipment
IMPORTANT: Make sure to review washer Installation Checklist
before installing Load/Unload modules.
IMPORTANT: If the character in position 7 of the unit serial number
is a 4 or less (S/N 36xxxx4xxx), modifications must be made to the
washer using upgrade kit #444-022, before installing conveyor
modules.
2. Review installation requirements for conveyor modules:
3. Place conveyor modules in order shown on the Equipment
NOTE: Leave sufficient space between and around modules to
perform installation.
4. Lock out and tag out electrical supply disconnect switch on the
5. Remove lower service access doors from both ends of the
NOTE: The following connections are required to tie the module cold
water piping to the existing washer cold water piping.
1. Locate washer cold water piping connecting cold water inlet to
2. Remove union (located underneath sump) connecting both
3. Remove piping attached to cold water inlet side (see Figure 3-
4. Replace piping with cold water supply piping provided (see
Uncrating/Installation Instructions
®
Reliance
Disinfector according to the Uncrating/Installation Instructions,
P-122992-165, provided with the washer.
a) Clearance - Clearance space shown on Equipment Drawing
is necessary for easy installation and proper operation and
maintenance of conveyor modules.
b) Utility Service Lines - Utility service requirements are shown
on Equipment Drawing. The conveyor modules require 120 V,
60 Hz, 1-phase, 2 wires. Check Equipment Drawing or Iden-
tification plate (located inside spray head compartment door)
for proper voltage.
c) Check floor level and note floor slope to determine how high
conveyor sections should be raised above floor when level-
ing.
Drawing, in correct relation to washer and building supply lines.
If modules are not at installation site, refer to Uncrating Instruc-
tions (Section 2) for proper moving instructions.
washer to OFF position and close washer supply valves.
washer.
condenser (see Figure 3-1). Piping is made of two parts.
pipes (see Figure 3-1, item 1).
1, item 2).
Figure 3-2).
®
444 Single Chamber Washer/
3
3-1
122994-142