Inspection At Power On (At Operation); Overhaul - Toshiba TVL Series Instruction Manual

Hide thumbs Also See for TVL Series:
Table of Contents

Advertisement

1.2.2 Inspection at Power ON (at Operation)

Description
Using the TP in the servo
ON condition, make sure
that each axis moves
normally in the jog mode.
Push each arm by hand in
the servo ON condition to
make sure that the arm is
secured.
Make sure that no abnormal
vibration or noise is caused.
Make sure that the teaching
points are in place.
Replace the batteries for
position detection with new
ones.

1.2.3 Overhaul

Description
Check for the consumable parts
and replace as necessary.
Replace the battery with a new
one.
Replace the switching power
supply unit with a new one.
Note: The items marked "●" may include some technical work.
It is difficult for the customer to implement such work, so please ask Toshiba
Machine Service Department.
D: Daily inspection
S: Semi-annual inspection
B: Biennial inspection
Check position
Entire robot
Each joint
Entire robot
Entire robot
Base swivel unit
Maintenance parts
Reduction gears,
motors, belts, harness
Backup battery in the
controller
In the controller
12
MAINTENANCE MANUAL
Q: Quarterly inspection
A: Annual inspection
D
Q
S
A
[1]
[1]
[1]
[1]
[1]
[1]
[1]
[1]
Every 5
years
[1]
[1]
B
Refer to
[1]
[1]
[1]
Para.
2.5.2
Refer to
STE 85440

Advertisement

Table of Contents
loading

Table of Contents