Gage Bilt GB108 Original Instructions Manual

Gage Bilt GB108 Original Instructions Manual

20v battery installation tool

Advertisement

Quick Links

20V BATTERY INSTALLATION TOOL
GAGE BILT
MADE in USA
ORIGINAL INSTRUCTIONS
GB108
GB108 SERIES
GB108
GB108/2
GAGE BILT TOOLS ARE AVAILABLE WORLDWIDE
E-MAIL US FOR A DISTRIBUTOR NEAR YOU.
Includes (1) VP1086
(2Ah Battery)
Includes (2) VP1086
(2Ah Batteries)
44766 Centre Court, Clinton Twp., MI. 48038 USA
Ph: +1 (586) 226-1500 Fax: +1 (586) 226-1505
solutions@gagebilt.com / www.gagebilt.com
S/N: 1143 AND ABOVE
PLEASE CONTACT GAGE BILT FOR
ALL OTHER SERIAL NUMBERS.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GB108 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Gage Bilt GB108

  • Page 1 Includes (1) VP1086 (2Ah Battery) GB108/2 Includes (2) VP1086 (2Ah Batteries) GAGE BILT TOOLS ARE AVAILABLE WORLDWIDE E-MAIL US FOR A DISTRIBUTOR NEAR YOU. GAGE BILT 44766 Centre Court, Clinton Twp., MI. 48038 USA Ph: +1 (586) 226-1500 Fax: +1 (586) 226-1505 MADE in USA solutions@gagebilt.com / www.gagebilt.com...
  • Page 2: Table Of Contents

    How to use the GB108 ................................11 Maintenance....................................12 Troubleshooting ..................................13 Parts Lists ....................................14 Accessories ....................................16 GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 3: Warranty

    1 year after the receipt of the material by the customer. THIS WARRANTY IS MADE IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED, INCLUDING MERCHANTABILITY. GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 4: Description And Technical Specifications

    Any other use is forbidden. The GB108 is a battery operated 20V cordless installation tool designed specifically for the efficient installation of blind rivets from 3/16” (4.8 mm) thru 1/4” (6.4 mm) diameter. It weighs just 4.4 lbs. (2.0 kg) and can be operated in any position. It has a 1.181” (30 mm) fastener setting stroke and a rated pull load of 4,496 lbs.
  • Page 5: Description Of Functions

    Battery with charging status indication Battery Lock / Release Latch Universal Quick Charger Images may not reflect actual tool GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 6: Warnings

    GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 7: Principle Of Operation

    PRINCIPLE OF OPERATION When the battery is connected to the tool, operation is controlled by a actuator to the motor. The GB108 incorporates an electronic actuator assembly to send a signal to the motor. When the actuator assembly is depressed, the gear on the motor spins the gear on the gear box assembly retracting the nose assembly collet.
  • Page 8: How To Set-Up The Gb108

    The charger (VP1087) is equipped with a temperature monitoring device that permits charging only in the temperature range between 32°F - 104°F (0°C - 40°C). GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 9 Do not use cover cap (VP1321) with non-self releasing nose assemblies. This would result in damage to the installation tool. Safety Switch Cover Cap (VP1321) Images may not reflect actual tool GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 10 A significantly shorter operating time after recharging indicates that the battery (VP1086) is worn out and needs to be replaced. Observe all local disposal procedures. GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 11: How To Use The Gb108

    Press actuator to start cycle. Release actuator as soon as fastener breaks. Repeat steps 1-4. Images may not reflect actual tool or fastener GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 12: Maintenance

    *Changing the jaws should be done by the maintenance personnel when the fastener can no longer be set in one stroke. *Changing the anvil insert should be done by the maintenance personnel every 25,000 to 50,000 fasteners. *Full inspection should be done every 300,000 fasteners or once a year by qualified trained maintenance personnel or by Gage Bilt. Battery Disposal: Do not throw the battery (VP1086) into the domestic waste, fire or water.
  • Page 13: Troubleshooting

    (See page 9). Fault Indicator (Red / Yellow LED) Cover Cap (VP1321) Image may not reflect actual tool GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 14: Parts Lists

    QUICK RELEASE C RING * Sold Separately GB108 SERIES GB108 Includes (1) VP1086 (2Ah Battery) GB108/2 Includes (2) VP1086 (2Ah Batteries) GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 15 This page intentionally left blank GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.
  • Page 16: Accessories

    1/4” (6.3 mm) thru Rivet nuts M4-M10, M3/M12 Optional, 5/16” (7.9 mm) diameter Rivet studs M4-M8 seal plug. Process Monitoring GB108 20V BATTERY INSTALLATION TOOL S/N: 1143 AND ABOVE 7/21 REV 12/22 PLEASE CONTACT GAGE BILT FOR ALL OTHER SERIAL NUMBERS.

This manual is also suitable for:

Gb108/2

Table of Contents