Commissioning And Operation; Checking Before Commissioning; Battery Address Setting - Helios CUBE User Manual

Lithium-ion battery storage
Table of Contents

Advertisement

HELIOS CUBE BS4850-SH
User Manual
4. C
OMMISSIONING AND
Initial configurations must be carried out by installers or authorized persons once installation of the inverter
has been completed.
Read the User Manual at first.
4.1 C
HECKING BEFORE
Check list
Item
1.
Installation
2.
Cabling
3.
Breakers
4.
Unused terminals and ports
5.
Grounding
4.2 B
ATTERY ADDRESS SETTING
The purpose of setting the addresses for the battery modules is to define the master and slave batteries. A
address label is stuck on the inner side of the cabinet door (see Figure 4-1)
Helios New Energy Technology (Australia) Pty Ltd
O
PERATION
C
OMMISSIONING
Check scope
Make sure that the inverter and HELIOS Cube BS5048-
SH battery system are installed correctly, securely, and
reliably as per Chapter 3.
The AC and DC power cables and communication cable
are connected correctly, securely, and reliably.
All the AD and DC breakers connecting to the inverter
are OFF.
Unused terminals and ports are locked by watertight
caps and unused spaces for battery modules are
covered by cover sheets.
The ground cable is connected correctly, securely, and
reliably.