3. Installation
➢
Install the product in a sheltered place or install an awning over the product
➢
Keep the environment temperature under 50℃.
➢
The floor should be flat, solid and level.
➢
Do not cover or wrap the battery cabinet.
3.4 I
NSTALLATION
➢
Reserve enough clearance around the product to ensure sufficient space for installation and heat
dissipation as shown Figure 3-1.
➢
Install the product vertically on a solid and flat floor.
➢
Do not install the product at forward tilted, excessive back tilted, side tilted, horizontal, or up-side-down
positions.
3.5 I
NSTALLATION
Step 1
Position the battery cabinet at the right place according to Section 3.4
16
C
LEARANCE
Figure 3-1 Installation clearance
P
ROCEDURE
HELIOS CUBE BS4850-SH
Helios New Energy Technology (Australia) Pty Ltd
User Manual