Page 8
Wood and Kit Identification Bottom Playhouse 2 @ INNER TREEHOUSE WALL KIT PART #WK55...
Page 9
Step #1-Teak Removal Bottom Playhouse Unbolt and remove all four PT246 from under floor base. Discard teaks they are no longer needed. Step #2-Ground Support Base Bottom Playhouse Begin by laying out (2)- FJ2455 and (2)-GSI2455 as shown in drawing. Measure 3 ½”...
Page 10
Step #3 Floor Base Install Bottom Playhouse Rest floor base on top of ground base. Bolt into upright posts using B4 bolts. Make sure to bolt FJ2455 from the outside into the posts and GSI2455 from inside the base to the posts.
Page 11
PFR2455. Bolt in place using B4 bolts. Note: If ground is unlevel there will be a gap between the bottom playhouse floor and the ground supports. This is normal as the ground supports flow with the grade of the...
Page 12
GSI2455. Bolt in place using B4 bolts. Note: If ground is unlevel there will be a gap between the bottom playhouse floor and the ground supports. This is normal as the ground supports flow with the grade of the...
Page 13
Bolt in place using B4 bolts. Repeat on opposite side. Note: If ground is unlevel there will be a gap between the bottom playhouse floor and the ground supports. This is normal as the ground supports flow with the grade of the...
Page 14
Step #9 Entrance Wall Install Bottom Playhouse Install Inner WK55 flush with top of upper PFR2455 on the inside of upright posts. Bolt in place using B4 bolts. Repeat on opposite side.
Page 26
Wood and Kit Identification Sky Bottom Playhouse 2 @ INNER TREEHOUSE WALL KIT PART #WK55...
Page 27
Step #1-Teak Removal Sky Bottom Playhouse Unbolt and remove all four PT246 from under floor base. Discard teaks they are no longer needed. Step #2-Ground Support Base Sky Bottom Playhouse Begin by laying out (2)- FJ2455 and (2)-GSI2455 as shown in drawing. Measure 3 ½”...
Page 28
Step #3 Floor Base Install Sky Bottom Playhouse Rest floor base on top of ground base. Do not bolt at this time. Step #4- Floor Kit Install Sky Bottom Playhouse Place FLK1248 on top of installed floor base. Bolt into place using center holes on FJ2455.
Page 29
PFR2455. Bolt in place using B4 bolts. Note: If ground is unlevel there will be a gap between the bottom playhouse floor and the ground supports. This is normal as the ground supports flow with the grade of the...
Page 30
Step #7-Inner Wall Countersink Sky Bottom Playhouse Counter sink holes on the backside of inner WK55 using 7/8” drill bit on both WK55’s. Step #8-Inner Wall Install Sky Bottom Playhouse Install Inner WK55 flush with top of upper PFR2455 on the inside of upright posts.
Page 31
Secure in place using B6 bolts. Repeat steps #6,#8, and #9 Step #10-Upper Front Wall Install Sky Bottom Playhouse Place upper side wall panel on outside of upper tower post. Raise until the top of the rail is flush with the bottom of the floor joist.
Page 32
Step #11- Floor Level Sky Bottom Playhouse Using two people raise floor base upward until the floor decking is flush with the bottom of the playhouse walls. Secure in place using B4 bolts. Step #12-Entrance Wall Rails Bottom Playhouse Install GSI2455 flush with the bottom of FJ2455.
Page 33
Step #13- Entrance Wall Install Sky Bottom Playhouse Install (3) SWB48 flush with top of GSI2455 screw in place using B6 screws. Repeat on opposite side.