Required Number Of Outlets/Sockets; Circuit Protectors; Table 16 Required Conditions For Distribution Board Circuit Protectors - Fujitsu ETERNUS AF250 S2 Site Planning Manual

Hide thumbs Also See for ETERNUS AF250 S2:
Table of Contents

Advertisement

1.
ETERNUS AF Installation
Outlet/Socket Specifications

Required Number of Outlets/Sockets

The number of power outlets/sockets required to install the ETERNUS AF depends on the number of drive enclo-
sures and power distribution units.
It is recommended that the power cords of the drive enclosures are connected to the power distribution units
that are installed in the same rack. Secure the necessary number of power outlets within the same rack to avoid
connecting power cords to power outlets in different racks. It may be necessary to purchase additional power
distribution units depending on the installation locations of enclosures.
Without Power Distribution Units
Two power sockets are required for each enclosure.
With Power Distribution Units
Two power sockets are required for each power distribution unit.

Circuit Protectors

Protection coordination must be secured between the distribution board circuit protectors and the ETERNUS AF
or power distribution units to protect the ETERNUS AF by blocking the failed circuit immediately when a power
supply input error occurs.
Distribution board circuit protectors must satisfy the following required conditions and breaking characteristics.
Required Conditions
The distribution board circuit protectors must satisfy the required conditions that are listed below.

Table 16 Required Conditions for Distribution Board Circuit Protectors

Connected device
Power distribution unit (AC8A/200-240V, 1U, 4 outlets)
Power distribution unit (AC200-240V, 2U, 12 outlets)
Power distribution unit (AC16A/200-240V, 2U, 16 out-
lets)
Power distribution unit (AC200-240V, 2U, 16 outlets)
Power distribution unit (AC24A/200-240V, 2U, 16 out-
lets)
Power distribution unit (AC24A/200-240V, 1U, 4 outlets)
ETERNUS AF (without power distribution units)
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays Site Planning Guide
Copyright 2021 FUJITSU LIMITED
Current capacity
Regions other than
Power supply voltage
the EMEIA, Central
American, and Car-
ibbean regions
AC 200 – 240V
15A
AC 200 – 240V
20A
AC 200 – 240V
30A
AC 100 – 120V
15A
AC 200 – 240V
23
The EMEIA, Central
American, and Car-
ibbean regions
16A
P3AG-1812-06ENZ0