Overview

This user's guide gives a general overview of the evaluation module (EVM) and provides a general
description of the features and functions to be considered while using this module. This manual is
applicable to the ADS62P42/43/44/45/48/49, ADS62P22/23/24/25/28/29 and ADS62C15/17 analog to
digital converters (ADC), which will be collectively referred to as ADS62PXX. This document should be
used in combination with respective ADC data sheet. The ADS62PXX EVM provides a platform for
evaluating the analog-to-digital converter (ADC) under various signal, clock, reference and power supply
conditions.
1.1

ADS62PXX EVM Quick-Start Procedure

The ADS62PXXEVM provides numerous options for providing clock, input frequency and power to the
ADC under evaluation. The quick start procedure describes how to quickly get initial results using the
default configuration of the EVM as it was shipped. The EVM can be put back to default configuration by
setting all jumpers to the default positions as described in
for the Input Frequency (IF) and the clock input, each to be a single ended input that is
transformer-coupled to the ADC. The default configuration for the power supply is to provide a single 5V
supply to the red banana jack J10, PWR IN. The default configuration for the EVM is to control the modes
of operation by jumper settings for parallel input control pins rather than serial SPI control of the register
space. The other modes of operation of the EVM are described in the latter sections of this document. If
users modify the default jumper settings, this procedure does not apply.
A quick-setup procedure for the default configuration of the ADS62PXX follows:
1. Verify all the jumper settings against the schematic jumper list in
2. Connect the 5V supply between J10 (PWR IN) and J12(GND). If you are using the TSW1200 for
capture, it also can be used to source 5V for the EVM. To use the 5V output power of the TSW1200,
configure JP8 to short 1-2, J22 to short 1-2, and jumper over 5V from the banana jacks on the
TSW1200 to J10 on the ADC EVM. Do not connect a voltage source greater than 5.5V.
3. Switch on power supplies.
4. Using a function generator with 50Ω output impedance, generate a 0V offset, 1.5V
into J19. The frequency of the clock must be within the specification for the device speed grade.
5. Use a frequency generator with a 50Ω output impedance, generate a 0V offset, –1 dBFS-amplitude
sine-wave signal into J6 (Channel A) or J3 (Channel B).This provides a transformer-coupled differential
input signal to the ADC.
6. Connect the TSW1200 or suitable logic analyzer to J8 to capture the resulting digital data. If a
TSW1200 is being used to capture data, follow the additional alphabetically labeled steps. For more
details, see
Connecting to FPGA
a. After installing the TSW1200 software and connecting the TSW1200 to the USB port, open the
TSW1200 software.
b. Depending on the ADC under evaluation, select from the TI ADC Selection pull-down menu.
c. Change the ADC Sample rate and ADC Input frequency to match those of the signal generator.
d. After selecting a Single Tone FFT test, press the Capture Data button.
Windows is a registered trademark of Microsoft Corporation.
6
ADS62PXXEVM
Table
Platforms, located in this document.
User's Guide
SLAU237A – May 2008 – Revised April 2009
ADS62PXXEVM
1. The default configuration of the EVM is
Table
1.
sine-wave clock
PP
SLAU237A – May 2008 – Revised April 2009
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS62P EVM Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents