GM1700
Handling Instructions
Pre-installation Adjustments
Installation of Attachments
For details on installing the attachment, please
refer to the separate attachment's Operating
Manual.
Installation of Universal Joint
Important
Check the alignment point of the splines
before installing (inserting) the universal joint.
1.
Check the alignment point of the splines for
connecting the universal joint.
Installation of Universal Joint_001
2.
Align the holes of the universal joint and
gearbox, and then install it with the pin,
washer and cotter pin.
4 3
Installation of Universal Joint_002
1
2
3
4
Note:
For removing the universal joint, reverse the
installation procedure.
Page 4-2
zobulo-017
1
2
zobulo-018
Universal joint
Pin
Washer
Cotter pin
Inspections
Inspect the machine according to the
maintenance schedule so that you will be able to
take advantage of its optimum performance for a
long period of time.
Hood
Inspection of Hood (Intake)
1.
Make sure that there is no damage to the
hood.
2.
Make sure that the intake is not dirty.
Cleaning of Hood (Intake)
Important
An unclean hood intake may cause
overheating or damage to the engine.
It may also cause malfunction of the hydraulic
system.
Important
While cleaning, do not allow water to get on
the engine.
This may cause damage to the engine.
If the intake has been contaminated with dust,
be sure to clean it.
After operating the machine in a dusty
environment, it is important to remove dust as
soon as possible.
1.
Open the hood.
2.
Carefully clean the inside and outside of the
intake with water or compressed air.
5
2
Cleaning of Hood (Intake)_001
4
s2vhhj-002
Pre-installation Adjustments
1
3
3