Fujitsu AUYG18LVLB Design & Technical Manual page 215

Simultaneous multi
Hide thumbs Also See for AUYG18LVLB:
Table of Contents

Advertisement

4.
Place the branch pipe in a horizontal position as far as possible.
a. Only place the branch pipe as shown below during unavoidable circumstances.
b. When connecting the main piping, do not bend it near the connection section. If the main
pipe must be bent due to unavoidable circumstances, ensure that the linear section is 10
times or more than the diameter of the connection piping.
5.
Welding the piping
Check that the connection piping is securely inserted into the branch pipe before welding.
CAUTION
• During piping work, apply nitrogen gas while brazing the pipes. If pipes are brazed without ap-
plying nitrogen gas, it will create a large amount of oxidation film, which will cause a critical mal-
function.
• To prevent moisture or foreign matter from entering during work, do not leave the piping open.
• Refer to installation manual supplied with the outdoor unit for sealing test evacuation proce-
dures.
3-4. Branch pipes
Liquid
Horizontal
position
Liquid
To indoor unit
ØD
Straight pipe =
(D x 10) or more
Main pipe
R
To outdoor unit
Horizontal
position
Gas
To indoor unit
ØD
Main pipe
R
- 207 -
Gas
To indoor unit
To indoor unit
Straight pipe =
(D x 10) or more
To outdoor unit
3. Pipe installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents