Texas Instruments INA232EVM User Manual page 9

Table of Contents

Advertisement

www.ti.com
a. A green indicator with the device type and the text DEVICE CONNECTED should also be visible near
the top-left of the GUI window, as shown in
b. If Hardware Connected and DEVICE CONNECTED do not show in the GUI, check the different
hardware COM ports under Options >> Serial Port, as shown in
c. If the hardware still does not connect, make sure you are using the correct GUI/EVM combination.
i.
If you are using the correct GUI/EVM combination, you may need to reprogram the firmware of the
SCB, as described in
SBOU264B – MAY 2021 – REVISED DECEMBER 2022
Submit Document Feedback
Figure 4-6. Hardware Connected
Figure
4-7.
Figure 4-7. Device Connected
Figure 4-8. Change Serial Port
Firmware
Debug.
Copyright © 2022 Texas Instruments Incorporated
Figure
4-8.
INA232EVM, INA234EVM and INA236EVM
Operation
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INA232EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ina234evmIna236evm

Table of Contents