Pow-R-Line X Retrofit Panelboards Installation Criteria The Eaton Pow-R-Line P1RX & P2RX panelboards are intended for use in the following list of panelboard enclosures and which meet the minimum size requirements listed in the tables below. Table 1. P1RXL & P1RXB Panelboards...
Eaton Corporation’s liability for any errors or omissions in DEATH OR SERIOUS INJURY. this document is limited to the documentary correction of errors. Eaton Corp. will not be responsible in any event for WARNING errors or omissions in this document or for any damages, incidental or consequential (including monetary losses), “WARNING”...
Pow-R-Line X Retrofit Panelboards Pre-Installation: Receiving, Handling and Removal of Existing Panelboard Interior Storage DO NOT work on electrical equipment while energized. Verify power entering the equipment is de-energized at the source. Receiving Follow appropriate lockout procedure to this panel before Upon delivery, use the packing list to confirm the number starting work.
Page 7
Pow-R-Line X Retrofit Panelboards Figure A: Mount Dead-front Cover to Chassis Figure C: Measuring Depth of Enclosure Loosen qty. 8, 10-32 screws Fig. D installed at Locating Interior Mounting Holes in Enclosure the chassis corners. In most instances the chassis should be centered in the Figure D: Depth Adjustment Bracket Screws enclosure unless a special offset trim has been ordered.
Page 8
Pow-R-Line X Retrofit Panelboards Trim Installation Verify Interior depth adjustment - Using a non-conducting, insulated straight edge, verify dimension from the front Install dead-front cover to the rear of trim with supplied surface of the dead-front cover mounting bracket. This #10-32 Keps nuts.
Page 9
(AHJ). Refer to the National Electrical Code for specific removed with a vacuum cleaner. Use a lint-free cloth requirement or contact Eaton. Field-testing of ground fault to remove dust and dirt on other surfaces. Never protection must follow instructions provided with each use compressed air as this may blow contaminants GFP device.
Pow-R-Line X Retrofit Panelboards that conductors are not pinched between parts when CAUTION installing the dead-front cover and trim. All parts should be aligned and secured when installed. Do not leave holes or gaps in the dead-front construction. DO NOT TEST A CIRCUIT BREAKER WHILE IT’S IN SERVICE Clean up any debris in and around the panelboard.
Pow-R-Line X Retrofit Panelboards Maintenance testing, remove all control power fusing and connections to products, which will be damaged in this test. This includes It is essential to maintain the equipment in satisfactory all components with control wire fusing, Transient Voltage condition.
Page 12
DO NOT USE COMPRESSED AIR TO CLEAN OR BLOW OUT parts, insulators, insulation material and overcurrent devices DEBRIS OR DUST IN PANELBOARDS. must be replaced with renewal parts from Eaton. (Refer to your local Eaton Sales Representative for support.) WARNING...
Page 13
DO NOT ATTEMPT TO RE-ENERGIZE PANELBOARD approval, it is essential that only new parts and components OVERCURRENT DEVICES AFTER ELECTRICAL EVENTS, from Eaton be utilized. When ordering renewal parts SUCH AS SHORT-CIRCUITS, GROUND-FAULTS AND or when requesting information on the panelboard, it is OVERLOADS, essential to include as much information as possible.
Need help?
Do you have a question about the P1RX 240Vac Max and is the answer not in the manual?
Questions and answers