Pressures Test - Bosch ACS 763 Original Instructions Manual

A/c service-unit
Hide thumbs Also See for ACS 763:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 44
en
70 | ACS 763/863 | Instructions for use
22. The station generates a vacuum in the A/C system
for the programmed time interval.
« After the vacuum has been carried out, the sta-
tion performs a pressure test for 5 minutes (only
for ACS 863-OE). A small amount of refrigerant is
charged and recovered through the flushing cir-
cuit, while the station constantly checks for any
pressure loss inside the system.
23. After a small charge, the refrigerant charged is
recovered through the low pressure service hose.
24. Operations 23 are repeated three more times to
ensure an effective system cleaning.
« After completing the fourth cycle, the station au-
tomatically drains oil.
« When the oil drain is complete, the station dis-
plays the total amount of oil discharged during
the process.
25. After successfully completing the flushing and after
reassembling the A/C system, replace the oil lost
during the process.
26. For further instructions, refer to the vehicle
maintenance manual.
27. Select
to return to the Functions Menu.
|
SP00D00490
2019-03-05
6.11

Pressures test

To check if the system is efficient, check the pressures
in the system as follows:
1. Call up the Main Menu.
2. Select
.
3. Select
.
4. Select Functions.
5. Select A/C Perfomance Test.
6. Enter the service data and confirm with
(see chapter 6.1).
« ACS 763/863 displays a dedicated message that
indicates to the operator the procedures to be
performed to start the test.
i
It is possible not to perform the test with
directly to phase 12 displaying.
7. Connect the high pressure (red) and low pressure
(blue) service hose to the vehicle A/C system.
8. Open the valves of the service hose connections
turning the ring nuts clockwise.
9. Turn on the vehicle and the A/C system on the
vehicle.
10. Select
to continue.
i
Wait for the stabilization of the pressures and read
the high pressure value displayed on the respective
pressure gauge.
11. Enter the high pressure reading value and the air
temperature value of the air vents in the appropriate
fields. Confirm with
i
Select
to print the displayed report.
Select
to continue.
12. Follow the instructions displayed and confirm with
13. Turn off the A/C system and the vehicle.
14. Close the valves of the service hose connections
turning the ring nuts counter-clockwise.
15. Select
to end.
and go
.
Robert Bosch GmbH
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs 863Acs 863-oe

Table of Contents