Initial Start-Up - Waeco ASC 6300 G Operating Manual

A/c service unit
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
EN
17
Container for fresh oil
18
Container for UV additive (500 ml)
19
Drained oil receptacle
20
Cover flap
21
Main switch
22
Fan

12 Initial start-up

This chapter describes the procedures you have to carry out before you can operate the A/C service unit.
12.1
Setting up and switching on
Note In order to achieve correct measurements, the A/C service unit must be placed on a level flat sur-
face during operation. Ignore any error codes which occur during commissioning
page 36) and skip by pressing
1. Wheel the A/C service unit to the workplace and lock the front wheels.
2. Mount the service hoses.
3. Set the length of the service hoses
4. Connect the A/C service unit to the power supply.
5. To switch the A/C service unit on, set the main switch to
The switch-on delay runs for 35 s and the housing is ventilated. The software version number then appears in
the display for several seconds:
Dometic Germany GmbH
ASC6400G
LE
SN000000
SW:
Software status
DB:
Database
SN:
Serial number
LF:
Language file
6. Once the start-up procedure is complete, the A/C service unit requires the selection of the refrigerant
ing the refrigerant
12.2
Selecting the refrigerant
On initial start-up the A/C service unit displays the refrigerant selection menu.
1. In the refrigerant selection menu use the cursor keys
example R153A).
Refrigerant
R-134a
R-1234yf
R-513A
10
ENTER
.
(Setting the length of the service hoses
SW
LE640004
DB
mgas2107
LF
mgas0081
on page 10).
on page 11).
I
.
or
to select the desired refrigerant (in the following
(Troubleshooting
on
(Select-
 

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asc 6400 g91033031059103303106

Table of Contents