Electrical Ratings for +12V / 24V
For Models without Power Supply
 Input Voltage: 10-25VDC regulated (power-limited out-
put from Listed control panel Aux/Remote Fire Power).
 Input Current:
10VDC standby: 162mA
12VDC standby: 125mA
15VDC standby: 110mA
24VDC standby: 100mA (Commercial Fire models)
25VDC standby: 100mA (Commercial Fire models)
Wi-Fi Module: (Optional) Add 40mA to the above.
(With peak RF transmission current of 325mA).
Electrical Ratings for the IN 1 Fire Input:
 Input Voltage: 9-25VDC.
 Maximum Input Current: Up to 2mA from FACP NAC
circuit
Electrical Ratings for IN 2, IN 3, IN 4, and IN 5:
(Inputs IN 2, IN 3, IN 4, and IN 5 are Class B)
 Maximum Loop Voltage: 25VDC.
 Maximum Loop Current: 1.2mA
 End of Line Resistor (EOLR) Value: 10K (2 req'd)
Electrical Ratings for PGM3 Output:
 Open Collector Output: Maximum Voltage 3V when
active; 25V maximum when not active.
 Maximum PGM Sink Current: 50mA (up to 15VDC),
25mA (15.1VDC - 25VDC)
Physical (W x H x D)
 Metal Housing: 11½ x 9½ x 3½" (29.2 x 24.1 x 8.9cm)
 Mounting: Metal housing includes two keyhole slots for
wall mounting (see measurements on page 7)
 Antenna Length: 8.25" (21cm)
Environmental
 Operating Temperature: 0°C - 49°C (32°F - 120°F)
 Humidity: Maximum 93% Non-Condensing
 Indoor / dry location use only
Supervised Fire Input Wiring Option
6
8
Radio GND
-or-
(TB6 and
TB88)
10K
10K
C
TBL*
The EOLR must be installed and located within the control panel housing.
For Commercial Fire installations, a UL Listed Fire Alarm regulated power supply or FACP regulated auxiliary output is required.
*Reverse polarity / energized state.
**Factory programmed options; may be changed at the NOC website (www.NapcoNOC.com).
2
To StarLink
5
7
-or-
Terminals
IN2 (TB5)
-or-
IN3 (TB7)
(Radio)
(Alarm Panel)
C
N/O
N/O
N/C
N/C
Alarm
StarLink
SLE Commercial LTEVI & LTEAI Series Dual-Path Alarm Communicators -- Installation Instructions

TERMINAL DESCRIPTIONS

Configure all inputs and outputs using the Management
Center screen (located at www.NapcoNOC.com). Located
at the bottom of the StarLink communicator PC board, the
17 terminals are described as follows:
TB1: PWR (+10 - 25VDC)
(Refer to section "STEP 4: APPLY POWER")
TB2: PWR GND (–)
(Refer to section "STEP 4: APPLY POWER")
TB3: PGM3 (–): Open collector output. PGM3 is normally
on (active low). When it is triggered (for example, a
trouble is detected) it becomes open collector/high.
To have a zone dedicated to an StarLink communi-
cator trouble, insert one side of the end of line resis-
tor into this PGM3 terminal, and wire the other side
of the resistor to the positive terminal of the zone.
TB4: IN 1 (+): Smart Channel input. Active high input
for wiring to the control panel bell output. When this
input detects a pulsing temporal 3 high, it sends a
Fire alarm; a pulsing temporal 4 (CO Alarm), a CO
alarm is sent. When used, these conductors must
be run in conduit (max 20 feet for Commercial Fire,
and 3 feet for Residential Fire). For this input to re-
port to a central station, the StarLink communicator
must be configured with the central station telephone
number and correct reporting formats and codes.
For more information, see WI2140 located at
www.NapcoNOC.com.
TB5: IN 2 (+): Fire Trouble input**. Wire to FACP trou-
ble relay N/O with parallel 10K EOLR at FACP.
Note: Inputs IN 2, IN 3, IN 4 and IN 5 can be su-
pervised end-of-line resistor inputs that can be trig-
gered with N/O or N/C relay contacts.
TB6: IN 2 (–): See TB5, above.
TB7: IN 3 (+): Fire Alarm input**. Wire to FACP Fire
Alarm relay N/O with parallel 10K EOLR at FACP.
TB8: IN 3 (–): See TB5 and TB7, above.
Secondary Telephone:
connection.
Primary Telephone: RJ-45 socket for FACP DACT con-
nection.
TB9: IN 4 (+):
Supervisory Alarm input**.
FACP Supervisory relay N/O with parallel 10K EOLR
at FACP.
TB10: IN 4 (–): See TB5 and TB9, above.
TB11: IN 5 (+): Water Flow Alarm input**. Wire to FACP
Water Flow relay with parallel 10K EOLR at FACP.
TB12: IN 5 (–): See TB5 and TB11, above.
TB13: GND: Earth ground terminal.
Ethernet: Connect the SLE Dual-Path communicator to
your broadband modem, router or switch. Note: The
cable modem/router and switch (if any) at the prem-
ises requires standby power, therefore a UL 1481 /
UL 864 or UL Listed ITE (Information Technology
Equipment) UPS must be used at the premises to
power these devices for a minimum of 24 hours.
TB19: N/O OUT1: Normally open. Dry contact Form C
relay. Add shunt to lower two pins of JP1 for wet
contacts.
RJ-45 socket for FACP DACT