OSEE G7 4K ULTRAHD User Manual page 14

Sdi/hdmi on camera monitor
Hide thumbs Also See for G7 4K ULTRAHD:
Table of Contents

Advertisement

Unpack and Installation
Confirm all the items listed on the packing list have been
received.
Remove all the packing material including electrostatic-resistant
packing.
Retain these packing materials for future use.
2.
Connect required cables for signal input and output.
3.
Connect the 11~17VDC power source through DC IN interface
or power the monitor by battery.
4.
As a final step, turn on the device by toggling the power
switch located on the rear of the unit.
Install Battery:
Only support SONY NP-F series currently. Please take note of the battery
installation direction according to the "NP-F" icon near the slot when
mounting the battery. The icons are as shown in the following illustration,
slide the battery down into the slot until a click is heard.
Figure 3-1 Battery Installation
8

Advertisement

Table of Contents
loading

Related Products for OSEE G7 4K ULTRAHD

Table of Contents