Commissioning; Precautions When Commissioning; Checklist Before Commissioning - Daikin RXP50N5V1B Installer's Reference Manual

Table of Contents

Advertisement

11
|

Commissioning

11 Commissioning
In this chapter

11.1 Precautions when commissioning

11.2 Checklist before commissioning

Installer reference guide
54
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during commissioning
and hand-over to the user.
11.1
Precautions when commissioning..........................................................................................................................................
11.2
Checklist before commissioning.............................................................................................................................................
11.3
Checklist during commissioning .............................................................................................................................................
11.4
To perform a test run .............................................................................................................................................................
11.5
Starting up the outdoor unit ..................................................................................................................................................
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
CAUTION
Do NOT perform the test operation while working on the indoor units.
When performing the test operation, NOT ONLY the outdoor unit, but the connected
indoor unit will operate as well. Working on an indoor unit while performing a test
operation is dangerous.
CAUTION
Do NOT insert fingers, rods or other objects into the air inlet or outlet. Do NOT
remove the fan guard. When the fan is rotating at high speed, it will cause injury.
NOTICE
Turn ON the power 6 hours before operation in order to have power running to the
crankcase heater and to protect the compressor.
During test operation, the outdoor unit and the indoor units will start up. Make
sure that the preparations of all indoor units are finished (field piping, electrical
wiring, air purge, ...). See installation manual of the indoor units for details.
1 After the installation of the unit, check the items listed below.
2 Close the unit.
54
54
55
55
56
RXF50~71D5V1B
R32 split series
4P519439-18T – 2022.06

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rxp60n5v1bRxp71n5v1b

Table of Contents