6
|
Unit installation
6.3.2 Precautions when mounting the outdoor unit
6.3.3 To provide the installation structure
Installer reference guide
30
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety
▪
"6.1 Preparing the installation
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Use a vibration-proof rubber (field supply) in cases where vibrations may be
transmitted to the building.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers (field supply).
(mm)
a 100 mm above expected level of snow
4
precautions" [
7]
4
site" [
25]
RXF50~71D5V1B
R32 split series
4P519439-18T – 2022.06