Download Print this page

Daikin 5MKS100LSG Service Manual page 22

Advertisement

Four Way Valve
Step
2
Remove the terminal
cover.
3
Unfasten the hook with
a flat screwdriver and
remove the overload
protector.
4
Disconnect the
terminals of the
compressor harness.
5
Remove the bushing for
the lead wire.
2. Remove the four way
valve.
1
Heat up the brazed
parts in order of (a) (b)
(c) (d).
2
Remove the four way
valve.
20
Procedure
Hook
Overload protector
Compressor harness
Bushing for lead wire
(a)
(b)
(c)
Terminal cover
(R18010)
(R24005)
U: red
V: yellow
W: blue
(R18007)
(d)
(R22553)
Si121293EC
Points
Removal Procedure

Hide quick links:

Advertisement

loading