5 Bill of Materials

Table 5-1
shows the bill of materials (BOM) for the TPS7A53EVM-080.
Designator
Quantity
!PCB1
1
C3
1
C8
1
C9
1
C10
1
C18
1
C19, C20
2
J3, J4, J5, J19
4
J13, J14, J15, J26
4
J16
1
J17
1
J22, J23
2
Q1
1
R5
1
R6
1
R14, R16
2
R20
1
SH-J1
1
TP1, TP2,TP3, TP4, TP5,
6
TP6
U1
1
U2
1
SBVU078 – NOVEMBER 2022
Submit Document Feedback
Table 5-1. Bill of Materials
Value
Description
Printed Circuit Board
10 µF
CAP CER 10 µF 10V X7R 0805
1 µF
CAP CER 1µF 10V X7R 0402
10000 pF
CAP CER 10000 pF 10V X7R 0402
47 µF
CAP CER 47 µF 6.3V 0805
0.1 µF
CAP CER 0.1 µF 50V X7R 0402
10 µF
CAP CER 10UF 50V X7R 1206
Standard Banana Jack, insulated, 10A, red
Standard Banana Jack, insulated, 10A, black
CONN HEADER VERT 2POS 2.54MM
CONN HEADER VERT 20POS 2MM
CONN SMA JACK STR 50 OHM PCB
MOSFET, N-CH, 30 V, 5 A, DQK0006C (WSON-6)
0 Ohm
RES 0 OHM JUMPER 1/10W 0603
13.3 kOhm
RES, 13.3 k, 1%, 0.1 W, 0603
20 kOhm
20 kOhms ±1% 0.1W, 1/10W Chip Resistor 0402
(1005 Metric) Automotive AEC-Q200 Thick Film
49.9 Ohm
RES Thick Film, 49.9Ω, 1%, 0.75W, 100ppm/°C,
1206
1x2
Shunt, 100mil, Gold plated, Black
Test Point, Compact, SMT
3-A, High-Accuracy, Automotive-Grade, Low-Noise,
LDO Voltage Regulator
5V, 7A/5A Low Side GaN Driver With 60MHz/1ns
Speed, YFF0006AEAE (DSBGA-6)
Copyright © 2022 Texas Instruments Incorporated
TPS7A53EVM-080 Schematic
PackageReference
PartNumber
LP080
0805
C2012X7R1A106M125A
C
0402
GMC04X7R105K10NT
0402
0402ZC103KAT2A
0805
08056D476MAT2A
0402
C1005X7R1H104K050B
B
1206
GMC31X7R106K50NT
571-0500
571-0500
571-0100
571-0100
Header, 2.54mm, 2x1, TH PBC02SAAN
Header, 2.54mm, 10x2,
NRPN102PAEN-RC
TH
SMA Straight Jack, TH
RF2-04A-T-00-50-G
DQK0006C
CSD17313Q2
0603
CR0603-10W-000T
0603
RC0603FR-0713K3L
0402
ERJ-2RKF2002X
1206
CRCW120649R9FKEAH
P
Shunt
SNT-100-BK-G
Testpoint_Keystone_Com
5016
pact
RTJ
TPS7A5310AQWRTJRQ
1
YFF0006AEAE
LMG1020YFFR
TPS7A53EVM-080 Evaluation Module
Manufacturer
Any
TDK Corporation
Cal-Chip Electronics
KYOCERA AVX
KYOCERA AVX
TDK Coorporation
Cal-Chip Electronics
DEM Manufacturing
DEM Manufacturing
Any
Any
Adam Tech
Texas Instruments
Venkel
Yageo
Panasonic
Vishay Dale
Samtec
Keystone
Texas Instruments
Texas Instruments
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS7A53EVM-080 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents