LORIN OPEN SHELVING - ASSEMBLY INSTRUCTIONS
PARTS INCLUDED
A [1] OPEN SHELVING
CARE INSTRUCTIONS
1. To clean, use a soft, dry or damp cloth.
2. Do not use any abrasive cleaners.
IMPORTANT SAFETY INSTRUCTIONS
l Professional assembly is strongly recommended.
2. For your safety, it is recommended that at least two adults assemble the shelving.
3. These instructions are provided for your safety. It is important that they are read carefully and completely before assemble the shelving.
ANTI-TIP KIT INSTALLATION INSTRUCTIONS
1. Unpack all parts and place them on a protected work surface.
Determine the final position of the shelving. Position the metal bracket (2) on the wall stud approximately 2" below the
metal bracket mounted to the back of the shelving. Mark and drill pilot hole into the center of stud with 3/32" drill bit Attach
metal bracket (2) onto the wall by using stainless steel screws (5) (Detail A). If the stud cannot be located, use toggle bolts (6) (Detail B).
2. Move the shelving into position where the brackets on the back edge are in line with the brackets on the wall.
3. Insert the clevis pin (3) through the holes on the brackets and on metal cord (1). Use hair pin (4) to go through the small hole in the clevis
pin (3) to lock it (Detail C).
4. Repeat above step to attach the end of metal cord (1) to the metal bracket on the wall (DETAIL C).
5. Check to make sure the metal cord is securely laced and locked to the brackets.
ATTACH TO WALL STUD WHERE POSSIBLE
HAVE A PROFESSIONAL ATTACH TO MASONRY OR CONCRETE WALLS
- -
NO.
ITEM
1
2
·�-
3
'
�
4
5
6
�
7
�
OR
DESCRIPTION
Metal cord
Metal bracket
Clevis pin
Hair pin
Stainless steel screw
Toggle bolt
Screwdriver
included
QTY.
1 pc.
2 pc.
2 pcs.
2 pcs.
2 pcs.
2 pcs.
not
Page 1 of 3
Need help?
Do you have a question about the LORIN and is the answer not in the manual?
Questions and answers