Securing the Machine
Use chains or straps of ample load capacity. Use
a minimum of 2 chains. Adjust the rigging to
prevent damage to the chains.
Winching the Machine onto a
Flatbed Truck
1 Fully lower the platform.
2 Push in the red Emergency Stop buttons, turn the
key switch to the off position and remove the key.
Turn off the circuit breaker. Cut out the power and
fixed the cable.
3 Remove the outriggers from the base and place
them in the storage sockets.
4 Inspect the entire machine for loose or
unsecured items.
5 Connect the cable to the winching point located
at the rear of the base.
6 Carefully winch the machine onto the truck.
7 Secure the machine base to the transport
vehicle. See Securing the Machine.
Loading the Machine with a Crane
Use the lifting eye mounted
on the rear mast column.
The battery pack must be
removed before lifting the
machine with a crane.
Disconnect the battery plug
before removing the battery pack.
Be sure to inspect the machine and remove any
loose or unsecured items.
Always place the lifting hook through the lifting eye
so that it points away from the machine.
GTWY SERIES 17