Download Print this page

Advertisement

Quick Links

assault WaKeBoaRd toWeR
installation guide
installation suPPoRt
1
GUIDE#: pwb-ASSAULT-004

Advertisement

loading

Summary of Contents for Aerial Assault Wakeboard Tower

  • Page 1 WaKeBoaRd toWeR installation guide installation suPPoRt GUIDE#: pwb-ASSAULT-004...
  • Page 2 ALWAYS inspect this product for loose bolts, fittings or damage before each use. • Always carefully CONSULT the user manual for proper installation, maintenance and usage. • Aerial is not liable for personal injury or property damage from the use of this or any other Aerial product. GUIDE#: pwb-ASSAULT-004...
  • Page 3: Tools Required

    eXPloded VieW tools ReQuiRed GUIDE#: pwb-ASSAULT-004...
  • Page 4: Parts List

    PaRts list TOWER PACKAGE ITEM # DESCRIPTION COMMENTS 2.25" TOWER JOINT - THREADED (INCL. M6 X 12mm BOLT) 2.25" TOWER JOINT - THRU HOLE (INCL. M6 X 12mm BOLT) DECK MOUNT M12 X 40mm BOLT FOR USE WITH ITEMS - 1, 2, 15 M12 X 45mm BOLT FOR USE WITH ITEMS - 3, 30 M12 X &...
  • Page 5 STEP 1 The mounting feet will need to be assembled to the side m12 SpLIT rail fittings, followed by attaching them to the side rails. Lock wAShErS m12 x 45mm LowEr SIDE rAIL fITTInG m12 x 40mm moUnT steP 2 Tape off all the areas that may potentially come into con- tact with the side rails.
  • Page 6 steP 4 Once the desired position is achieved, place one of the nylon mount washers over the piece of tape and trace around it with a permanent marker. STEP 5 Transferring marks from the other side. This step is very important! After taping the second side of the boat in approximately the same areas as the first side you will need to measure the distance that you marked on the first side of the boat...
  • Page 7 STEP 6 Drilling Once you have marked your 4 holes, check the underside of the deck for wires. If necessary, you should move the wires out of the way while you drill. We recommend drilling a small pilot hole which will keep the 17/32” drill bit from walking (mov- ing).
  • Page 8 STEP 7 Install the tower mounts to the boat deck in the order shown in the diagram. Note: in the case where the deck of your boat is less than 1/4” thick, a reinforcing kit is required to thicken and reinforce the deck in the mounting locations. CURVED DECK - MOUNT ASSEMBLY FLAT DECK - MOUNT ASSEMBLY m12 x 75mm...
  • Page 9 STEP 8 - CONTINUED... The side rails need to be mounted straight up and down. If they are leaning in or out, this will cause a problem with the tower when you want to fold it. steP 9 m6 x 12mm SpLIT Lock wAShEr Assembling the Switch Blade (Rear Leg) Start at the top of the switch blade and attach the trim...
  • Page 10 STEP 11 The lower section of the switch blade can now be assembled to the lower fittings and clamp using the trim washer, M12 X 45mm socket head cap bolt and threaded lap joint. Insert the front leg hinge joint into the lower section of the front arm STEP 12 (repeat for the other side).
  • Page 11 STEP 14 Drilling the top section. The X measurement is a great way to make sure that your tow point is in the center of your boat. To do this, measure from the tow point to your rear foot, then to your other foot.
  • Page 12 STEP 17 Once all the holes are drilled and all the fasteners are inserted (M10 x 75mm - Button Head Socket Bolt) the nylon lock nuts can be installed and all of the fasteners and nuts can be firmly tight- ened.
  • Page 13: Step 20 - Lowering The Tower

    STEP 20 - LOWERING ThE TOWER Lowering the tower requires at least 2 people. Never trailer your boat with the tower in the lowered position. Always check to make sure all fasteners are tight and secure before using the tower again. opTIon A opTIon b DISconnEcT...