BONFIGLIOLI ACTIVE ACT2 Series Quick Start Manual page 93

Frequency inverter 230 v/ 400 v
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 54
7.2 Status messages during commissioning (SS...)
The following status messages are possible during Setup:
Status message
SS000
OK
SS001
PC Phase 1
SS002
PC Phase 2
SS004
Parameter
identification
SS010
Setup already
active
SS031
Error – check
P. 259
SS032
Warning Phase
Asymmetry
SS099
Setup not
carried out yet.
7.3 Warning and error messages during
commissioning (SA.../SF...)
Warning messages during guided commissioning
Code
Meaning / Measure
SA000
No warning message present.
Error messages during guided commissioning
SF000
No Error
For more information about warning and error messages refer to
the applicable operating instructions document.
12/20
Auto set-up routine has been carried out.
The plausibility check (PC) of the motor data is active.
The calculation of dependent parameters is active.
The rated motor values are checked by the parameter
identification feature.
The setup routine via the control panel is being
carried out.
Error during the auto set-up routine. Check value of
259.
Current Error
The parameter identification feature diagnosed an
unbalance during the measurements in the three
motor phases.
Self-setup has not yet been carried out.
Quick Start Guide ACT
Meaning
GB
91

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACTIVE ACT2 Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Active act4 series

Table of Contents