Specifications
Cold Water Supply
Dynamic Water Pressure
Min: 0.2 bar
Max: 5.0 bar
3.0
3.0
2.0
2.0
4.0
4.0
1.0
1.0
0.
5.0
0.
5.0
Min: 5°C Max: 25°C
Pressure
Pressure
BAR
BAR
IMPORTANT
Maximum Static Pressure: 10.0 bar
Tools You'll Need
Flat head
Socket Spanner
Drill
Adjustable Spanner
Screwdriver
Prior to Installation
All products manufactured and supplied by Heritage are safe to use
provided that they are installed, operated and receive regular maintenance
in accordance with these instructions.
This product needs to be installed in accordance with, and meet the
requirements of the Water Supply (Water Fittings) Regulations 1999 and
current by-laws. For full Installation Requirements & Notes (IRN) please
visit wras.co.uk/directory.
Isolation valves must be fitted to the inlet water supplies to ensure ease of
future maintenance. Before installing this product the water supply must be
thoroughly flushed in order to remove any swarf, solder etc. Full access must
be made available for future maintenance/servicing purposes.
Before drilling into walls, check that there are no hidden electrical wires,
cables or water supply pipes. This can be checked with the aid of an
electronic detector.
If power tools are used do not forget to:
- Wear eye protection
- Unplug equipment after use
This product must not be modified in any way as this will invalidate
the guarantee.
If in doubt, contact a registered plumber, your Local Water Authority or the
Secretary of the Institute of Plumbing, address as follows:-
The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791
Installation Instructions
& User Guide
Please leave these instructions with
the end user
Product Code: SDABL01 (D1)
Inlet Water Temperature
Inlet Dimensions
Hot Water Supply
65°C
25°C
5°C
65°C Recommended
The inlet hot water must
be at least 10°C above the
required blend temperature.
Pipe Cutter
Silicon Sealant
Hexagonal Keys
Cavity Dimensions (mm)
Minimum
Fitting Depth: 50mm
Maximum
Fitting Depth: 75mm
Concealing Plate
Adjustment Range: 25mm
Pack Contents
x1
x2
x1
x1
*x1
x2
* not included with SDACDUAL codes
Valve Configuration
1
IMPORTANT
If installed in
conjunction with
a combination boiler
flow regulators
must be fitted.
Installation
150mm
Centres
1
Install suitable batons
(if required) into the
Inlet Connections
cavity. Take the finished
wall surface into
15mm
consideration when
Compression
fitting the valve into the
cavity. Mark the position
of the valve; drill and
plug holes to suit.
3
Pipe & Wire Detector
Hot
Connect the inlet
pipes ensuring the
olives are fitted.
25
50
6
Fit the handles.
x1
2.5
mm
x1
Increase
2
Temperature
x1
Pre-set
x2
to 42°C
Green Flow
Yellow Flow
Limiter (Cold)
Limiter (Hot)
Remove the inlet elbows and filters.
Remove the plastic inserts from the valve
inlets and insert the flow regulators.
Replace the elbows, ensuring the
filters are fitted.
Cavity Space
2
75mm
50mm
Baton
Secure the valve using the screws supplied
(solid walls only) or a suitable alternative.
Elbows can be
4
pointed up
or down
Plumb
your chosen
outlets into
the valve.
Cold
Turn on the
water
supply and
check the
valve for
any leaks.
Temperature Adjustment
1
Turn the
temperature handle
to the maximum
temperature setting.
Remove the handle
and spline adaptor,
then turn on the
shower.
3
Turn the spindle
to increase or
decrease the
temperature.
Check the temperature
REMEMBER
and adjust until
To service
you achieve the
your
Decrease
desired result.
Temperature
product!
2
Screw the shrouds onto
the valve.
REMEMBER
hot on the left,
cold on the right
5
Draw around
the concealing
plate as a template,
measuring in by 10mm
to give clearance.
Finish the wall surface.
Using a silicon sealant,
push on the concealing
plate and hold
firmly until set.
2.5
mm
Fit the temperature
handle back in the
maximum hot position.
2.5
mm
Need help?
Do you have a question about the Dartmouth SDABL01 and is the answer not in the manual?
Questions and answers