Operation Inspection - TOHATSU F40 Installation Manual

Multi-function tiller handle kit
Table of Contents

Advertisement

N
R
3
1
OFF
ON
START
PUSH TO IDLE CHANGE
Installation Maual 2016
2
F
4

Operation inspection

· Install stop switch lanyard 1.
· Place shift lever 2 into neutral (N) position.
· Insert key 3 and place it into "OFF" position.
• Do not operate the engine with
gear case out of water.
• Shift lever cannot work unless
throttle is fully closed. Do not
force to change the shift.
• Be sure to confirm that NO parts
will inter fere with the boat or
transom when the motor is at full
tilt.
· Neutral switch
Confirm that the engine does not start except
when in neutral.
· Stop Switch
Confirm that engine will stop when turn the key
into "OFF" position or by removing the stop
switch lanyard.
· PTT Switch 4
Press the "UP" and "DOWN" switch and confirm
PTT is working correctly.
· Engine rotation
Start engine and confirm whether idling rpm is
stable.
· Each time the main switch key is pressed in the
above manner, engine speed changes as follow
chart.
· Also, confirm whether engine rpm accelerates
smoothly.
At stating
850 rpm → 750 rpm → 650 rpm
↑ 
 
950 rpm ← 850 rpm ← 750 rpm
 
CAUTION
 
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

F50

Table of Contents