Check The Sensor Horizontal Level; Equipment Start Position Setting - Vatech A9 Technical Manual

Hide thumbs Also See for A9:
Table of Contents

Advertisement

2.2. Check the sensor horizontal level

1.
Place the digital level at the position as shown in the picture above, and check the horizontal
level. (Standard: ± 0.1° or less)
2.
If the sensor level does not meet the standard, loosen the 4 point bolts in the red circle, adjust it
to meet the standard, and then refasten it.

2.3. Equipment Start Position Setting

1.
As shown in the image above, set the Half value to [SPM_ACHF_XXXX] so that the guide line of
the rotator and the vertical are aligned in a straight line.
2.
Send the same values for CT half value [SPM_ACHF_XXXX] in the PANO half
[SPM_HFST_XXXX] and the CEPH half [SPM_CPHF_XXXX].
VDH-TeM-098
53 / 214
Vatech A9 (PHT-30CSS)
Technical manual
COPYRIGHT© 2020 VATECH
.
ALL RIGHTS RESERVED

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pht-30css

Table of Contents