Controller Operations
Using the control buttons
Run, Stop), run a catch test� If spreading product
that has already been tested, press
continue� To begin a test, press
run�
Once controller dispenses specific amount,
conveyor will stop� Press
Weigh material dispensed and enter actual weight
of material dispensed� Press
It is recommended a minimum of three (3) tests be
done PER PRODUCT to ensure accuracy� Once
each test is done, press "Repeat Calibration" to
run a subsequent test. When finished, press
The main Calibration screen will appear� To
calibrate with a known amount brought to a field,
press
Field totals can be reset from Summary
Note:
Screen if needed�
305438-J
� Conveyor will
to continue�
to continue�
(Reset,
to
- 68 -