Cross-Connect Rearrangement (Example: Office Conversion) - ADC Cross-Connect DSX-1 Operational Procedures Manual

Hide thumbs Also See for Cross-Connect DSX-1:
Table of Contents

Advertisement

(IF PRESENT)
-48V
RET
SG
WIREWRAP
OR
COAXIAL
CHANNEL
ANALOG
BANK
OUT
TRANSMIT
SWITCH
(EQUIPMENT A)
IN
RECEIVE
(IF PRESENT)
(IF PRESENT)
-48V
RET
SG
WIREWRAP
OR
COAXIAL
DIGITAL
OUT
SWITCH
TRANSMIT
(EQUIPMENT B)
IN
RECEIVE
(IF PRESENT)

CROSS-CONNECT REARRANGEMENT (EXAMPLE: OFFICE CONVERSION)

TRACER LED
TRACER LED
-48V
TL
IC
IC
MON
MON
OUT
OUT
1
OUT
OUT
IN
IN
4
2
MON
MON
IN
IN
(IF PRESENT)
(IF PRESENT)
GREEN
GREEN
TL
TL
BLUE
OUT
OUT
BLUE
T
T
BLUE-WHITE
BLUE-WHITE
R
R
IN
IN
ORANGE
ORANGE
T
T
ORANGE-WHITE
ORANGE-WHITE
R
R
TRACER LED
-48V
TL
IC
Step 1. Patch from the OUT jack of Equipment A to the IN
MON
OUT
Step 2. Patch from the IN jack of Equipment A to the OUT
OUT
Step 3. Wire new cross-connects between Equipment B and
Step 4. Remove patch cords.
IN
MON
IN
3
(IF PRESENT)
GREEN
TL
BLUE
T
OUT
BLUE-WHITE
R
ORANGE
T
ORANGE-WHITE
IN
R
ADCP-80-514 • Issue 1 • January 1999
(IF PRESENT)
-48V
-48V
TL
RET
SG
WIREWRAP
OR
COAXIAL
OFFICE
REPEATER
OUT
TRANSMIT
BAY
(EQUIPMENT C)
RECEIVE
IN
(IF PRESENT)
CROSS-CONNECTIONS
BEFORE CUTOVER
CROSS-CONNECTIONS
AFTER CUTOVER
TEMPORARY
PATCH CORDS
jack of Equipment C.
jack of Equipment C.
Equipment C.
11889-B
© 1999, ADC Telecommunications, Inc.
Page 11

Advertisement

Table of Contents
loading

Table of Contents