t
s
:
oP
tanDoFFs
1. Bend top standoffs by hand to
form general shape (see Figure
31).
2. Install top standoffs into position using supplied T-20 screws (see Figure 32).
3. Install heat shield support using four (4) supplied T-20 screws (see Figure 33).
20
Initial Installation
QUALIFIED INSTALLERS ONLY
Figure 32: Top Standoff Install
Figure 33: Top Standoff Support Install
Figure 31: Top Standoff Shape