Review Checklist - Vogt HE S Series Installation & Start-Up Instructions

Tube-ice machine
Table of Contents

Advertisement

Installation & Start-up – HES Series
Installation Review: A CHECKLIST
Make a visual check to be sure these steps have been taken BEFORE continuing.
CHECK: _____ PRIOR TO OPENING VALVES, check all joints for leaks which may have
developed during shipment. {NOTE: The required charge of Refrigerant 22 has been isolated
in the Receiver (15R).}
CHECK: _____ All water supply and drain connections for conformity to requirements
stipulated in this manual. See FIGURES 5, 7, and TABLE 2.
CHECK: _____ Electrical supply for proper size of fuses and for compliance to local and
national codes. See the machine nameplate for minimum circuit ampacity and maximum fuse
size.
CHECK: _____ All field installed equipment (air-cooled condenser, ice storage bin, ice
spreader, etc.) for proper installation.
CHECK: _____ The applicable portion of the Warranty Registration/Start-up Form for
proper completion.
NOTE: This machine is controlled by a PLC and can automatically start with power to the
machine after a two hour time lapse if the ice switch is in the on position and all other
requirements are met.